The access project which commenced last January in Cross and Passion College is now almost fully completed. The entire school building is now accessible to anyone who may find steps difficult to negotiate. Ramps are now in place throughout the building, wheel chair accessible toilets have been installed, accessible benches are in each classroom and a lift has been installed to allow access to the three floors in the old part of the building. A wheelchair lift has also been installed at the back of the stage in the hall to allow full access to the stage.
Thursday, July 23, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment